The plant exploits the water of the Oglio river captured in the Iscla area in the municipality of Monno. After a penstock section of about 2.5 km in length, the water reaches the production plant in the Municipality of Edolo. At full load, the three Francis horizontal-axis turbine units, by exploiting a gradient of over 130 meters, produce almost 6 MW of power. The plant construction has allowed the redevelopment of an old mule track now used for recreational purposes including walking and mountain biking.
Iscla Edolo
MW
of installed power
of installed power
0
million kWh
of energy produced
of energy produced
0
thousand
satisfied people
satisfied people
0
million kg
of CO2 saved
of CO2 saved
0